Risk Register

Select an assessment to edit its hazards

Score = Likelihood × Severity (calculated, not generated). Target scores are after proposed controls.

5×5 scale definitions
Likelihood (L)
  1. 1 Rare — Not expected to occur; only in exceptional circumstances
  2. 2 Unlikely — Could occur but not expected
  3. 3 Possible — Might occur at some point during the work
  4. 4 Likely — Will probably occur during the work
  5. 5 Almost certain — Expected to occur unless controlled
Severity (S)
  1. 1 Negligible — No injury or first aid only
  2. 2 Minor — Minor injury or ill health; short absence
  3. 3 Moderate — Injury or ill health needing medical treatment / lost time
  4. 4 Major — Serious injury, long-term ill health or permanent disability
  5. 5 Catastrophic — Fatality or multiple serious injuries
Risk score = L × S (1–25)
  • Low 1–4
  • Medium 5–9
  • High 10–14
  • Very high 15–25
#Hazard / harmExposedExisting controlsInitial L×SProposed controls / actionsOwner / dueTarget (after proposed controls)Legal refsSource / evidenceStatus
1
Open edges at roof and slab perimeter
Falls from height — fatal / major injury
Duct fitters, roof plant installersEdge protection installed by principal contractor15 · Very high
L3 × S5
Daily edge protection inspection; exclusion zone 2 m from unprotected edges; harness on MEWPSite supervisor
2026-11-10
5 · Medium
L1 × S5
S.L. 646.27; S.L. 646.11 (screen — verify)From evidence
Method statement MS-07 §4
Actions open
2
Manual handling of duct sections
Musculoskeletal injury, back strain
Duct fittersTwo-person lift for sections > 25 kg12 · High
L4 × S3
Use material lift / duct jack; pre-assemble at floor levelMEP foreman
2026-11-12
6 · Medium
L2 × S3
S.L. 646.10Manual entry
Reviewed
3
Contact with live electrical services in ceiling void
Electric shock, burns
Fitters drilling soffitServices drawings available10 · High
L2 × S5
Cable avoidance scan before drilling; permit-to-work for isolationElectrical coordinator
2026-11-08
5 · Medium
L1 × S5
S.L. 646.27; S.L. 646.11 (screen — verify)From evidence
Permit PTW-112
Verified
4
Silica dust and noise from drilling concrete
Respiratory disease; noise-induced hearing loss
Fitters, adjacent tradesFFP3 masks issued16 · Very high
L4 × S4
On-tool extraction (M-class); hearing protection zone; rotate tasksSite supervisor
2026-11-15
6 · Medium
L2 × S3
S.L. 646.14; S.L. 646.20; S.L. 646.13 (screen — verify)Manual entry
Actions open
5
Dropped objects from MEWP / ceiling level
Head injury to persons below
Other trades, visitorsHard hats mandatory12 · High
L3 × S4
Tool lanyards; barriers and signage below work zoneMEP foreman
2026-11-09
4 · Low
L1 × S4
S.L. 646.27; S.L. 646.09 (screen — verify)Manual entry
Draft
6
Simultaneous operations with ceiling and electrical trades
Collisions, struck-by, uncontrolled interfaces
All trades on Level 3Weekly coordination meeting12 · High
L3 × S4
Daily SIMOPS briefing; zone permits; shared lookahead planProject manager
2026-11-07
6 · Medium
L2 × S3
S.L. 646.27Manual entry
Draft

Initial risk matrix

Likelihood
5 Almost certain
5
10
15
20
25
4 Likely
4
8
1
1
20
3 Possible
3
6
9
2
1
2 Unlikely
2
4
6
8
1
1 Rare
1
2
3
4
5
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic

Severity

Low 1–4Medium 5–9High 10–14Very high 15–25Bold cells show hazard count

Target risk matrix — after proposed controls

Likelihood
5 Almost certain
5
10
15
20
25
4 Likely
4
8
12
16
20
3 Possible
3
6
9
12
15
2 Unlikely
2
4
3
8
10
1 Rare
1
2
3
1
2
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic

Severity

Low 1–4Medium 5–9High 10–14Very high 15–25Bold cells show hazard count